Work completed last week:

Randall Road:

  • Switched eastbound leg of Acorn to allow for construction in the center of the road
  • Excavated and placed stone base for the northbound lanes from Harnish to Huntington
  • Poured concrete pavement infill panels at southeast corner of Algonquin and Randall
  • Poured northbound pavement from Acorn to the north limits, poured left turn lane at Polaris
  • Poured concrete sidewalk at various locations
  • Paved asphalt on Acorn and various driveways
  • Installed storm sewer at various locations
  • Continued electrical work on foundations and wiring for the street lights and traffic signals at various locations
  • Continued work on the northbound retaining wall, pouring sidewalk on top of the wall
  • Installation of the remaining retaining wall at the east entrance to the pedestrian tunnel

Algonquin Road:

  • Paved the multi-use path on the south side of Algonquin
  • Landscaped on the north side of Algonquin
  • Opened westbound Algonquin Road traffic to 2 through traffic lanes

 

Work coming up:

Randall Road:

  • Concrete lane installation from Harnish to Huntington (2 lanes northbound)
  • Curb and gutter installation at various locations
  • Continued work on various side streets
  • Pavement installation on Stonegate, Huntington and Bunker Hill
  • Various driveway and sidewalk construction
  • Multi-use path construction
  • Continued northbound retaining wall work
  • Storm sewer work
  • Concrete pavement installation for turn lanes and gaps from Stonegate to the north end of the project
  • Asphalt installation on Acorn and other side streets

Algonquin Road:

  • Continue landscaping
  • Miscellaneous concrete sidewalk and curb installation
  • Median installation
  • Work on various side streets and driveways