The week of 10/27/2025, scheduled work includes:

Miller Road Bridge:

  • Continue framing the bridge deck for Miller Road

Ground Improvements:

  • Continue to drive timber piles south of Miller Road
  • Continue installation of pile caps and load transfer platform

Woods Creek Bridge:

  • Installation of cofferdams to isolate bridge construction from Woods Creek
  • Partial demolition of existing box culvert

Roadway Work:

  • Excavation and grading, Woods Creek to Ackman Road
  • Storm sewer installation from Angela Lane to Alexandra Blvd.
  • Installation of temporary sheeting to stabilize roadway at construction edge

The detour for the closure of the west leg of Miller Road at Randall Road remains in effect. Traffic in the area continues to be observed, and changes will be made if necessary. Please follow the marked detour routes and use extra caution by observing speed limits through the detour and construction zone.

📍 Click here for a Detour Map
🎥Click here for a Video showing the Detour Routes

Thank you for your continued patience during construction.

Comments are disabled