The week of 10/13/2025, scheduled work includes:

Miller Road Bridge:

  • Install river rock in channel under Miller Bridge
  • Begin framing the bridge deck for Miller Road
  • Frame retaining walls at bridge

Ground Improvements:

  • Continue to drive timber piles south of Miller Road

Roadway Work:

  • Excavation, stone placement and grading, Miller Road to Village and South of Woods Creek
  • Storm sewer installation from Village Road to Angela Lane
  • Installation of temporary sheeting to stabilize roadway at construction edge.

Traffic Alert – Randall Road Lane Closures
During the week of October 13, 2025, one lane in each direction on Randall Road will be closed between 8:00 a.m. and 4:00 p.m. from north of Acorn Lane/Polaris Drive to north of Miller Road. The closures are necessary for the installation of temporary sheeting to stabilize the roadway along the construction edge and for preliminary drainage work on the east side of Randall Road.  Please use caution and allow extra travel time when driving through the work zone.

The detour for the closure of the west leg of Miller Road at Randall Road remains in effect. Traffic in the area continues to be observed, and changes will be made if necessary. Please follow the marked detour routes and use extra caution by observing speed limits through the detour and construction zone.

📍 Click here for a Detour Map
🎥Click here for a Video showing the Detour Routes

Thank you for your continued patience during construction.