Beginning Monday, 4/12 (weather permitting), Stonegate Road will be under construction near the Randall Road intersection to mill the existing pavement, complete the cement base stabilization, and install the new asphalt pavement.  During this time, Stonegate Road will be open to Local Traffic Only. 
Flaggers will be present during the day while work is being conducted to guide traffic through the area.  At night the roadway will be open to 2-way traffic.

After the existing pavement is removed, vehicles will be required to drive on existing aggregate base and therefore should use alternate routes as much as possible. 

This work is anticipated to be completed by Wednesday, 4/21.